Field fix / guideDesign DocumentVendor-agnostic (IEC 61131-3)Power Plantindustrial-automation

Pulverized Coal Mill Outlet (PA) Flow Control — Control Design

Shared by TSIMEREZIVO Team · 4 Oct 2026 · 54 views

# TSIMEREZIVO Template: Pulverized Coal Mill Outlet (PA) Flow Control **Category:** Power Plant | **Industry:** Thermal Power Generation | **Language:** Ladder / Structured Text --- ## 📋 Overview ### Purpose Regulate primary air (PA) flow and temperature from the coal mill to maintain consistent coal-in-air concentration (fuel feed) to the furnace. The mill grinds raw coal into powder (~200 µm), mixes with hot air to fluidize particles, and transports coal-air suspension to burners. Control objectives: prevent accumulation (blockage), maintain temperature (too cold = moisture condensation), match burner demand. ### Typical Application - **Plant:** 100–300 MWe coal-fired boiler - **Coal Mill:** Ball or bowl mill (impact grinding) - **Primary Air Inlet:** 120–180°C (recycled flue gas + duct heater mix) - **PA Flow:** 40–100 kg/s (varies with load) - **Mill Outlet Temp:** 65–85°C (coal + air mixture) - **Coal Fineness:** 200 mesh (76 µm); measured by Blaine value (~2500 cm²/g typical) ### Critical Balance - **Too much PA:** Coal particles blow past burners into furnace (escape combustion); CO spikes - **Too little PA:** Coal accumulates in mill → blockage → conveying line rupture - **Too cool:** Moisture in coal condenses → bridging (powder clogs) → shutdown - **Too hot:** Coal particles devolatize prematurely → flame stability loss --- ## 🎯 Control Philosophy ### Key Equations **Coal Mass Flow (Indirect Measurement):** ``` Coal Flow [kg/s] ≈ PA Flow [kg/s] × Coal Concentration [%] / (100 − Coal %) Typical: 60 kg/s PA × (25% coal) / 75% air = 20 kg/s coal + 40 kg/s air (stoichiometric balance depends on coal rank) ``` **Mill Outlet Temperature (Psychrometric Balance):** ``` T_outlet [°C] = T_PA_inlet [°C] − ΔT_evaporative_cooling = T_inlet − (latent heat of moisture evaporation / sensible heat) ≈ 120°C inlet − 35°C = 85°C outlet If T_outlet < 60°C: Risk of coal moisture condensation → bridging ``` **Coal Fineness (Blaine Value):** ``` Blaine [cm²/g] = specific surface area of particles <1500 cm²/g → Coarse; poor burnout (CO emissions) 1500-2500 cm²/g → Optimal (this range) >3000 cm²/g → Fine; ring flash → mill vibration Scan mill discharge via online Blaine analyzer (slow feedback, 5–10 min response) ``` ### Control Strategy: Cascade PA Flow + Temperature ``` Load Demand (MW) │ ├─→ [Load Table] → Desired Coal Flow [kg/s] │ │ │ ├─→ Coal Conc % (fixed 22–25%) │ │ │ └─→ Required PA Flow [kg/s] │ │ │ ├─→ Mill Fan VFD Speed │ │ │ └─→ PA valve modulation │ └─→ [Temperature Control] → PA Duct Heater (electric OR steam) ├─→ Maintain 65–85°C outlet └─→ Prevent condensation ``` --- ## 🏗️ Control Logic ### Pseudocode: Coal Mill Outlet PA Control ```pascal PROGRAM CoalMillOutletControl; { ========== DECLARATIONS ========== } VAR -- INPUT SENSORS pa_flow_actual : REAL; { 0-150 kg/s, differential pressure flow meter } mill_outlet_temp : REAL; { 0-100 °C, RTD in mill discharge } pa_inlet_temp : REAL; { 0-200 °C, duct heater outlet } mill_vibration : REAL; { 0-10 mm/s, accelerometer (fineness risk) } coal_mill_load_amps : REAL; { 0-500 A, motor current (grinding effort) } mill_bowl_temperat : REAL; { 0-100 °C, optional; mill internals } burner_demand_signal : REAL; { 0-100 %, from burner assembly } -- CONTROL SETPOINTS pa_flow_sp : REAL; { kg/s, load-scheduled } mill_outlet_temp_sp : REAL := 75.0; { Target °C } mill_outlet_temp_high : REAL := 85.0; { Risk of coal devolatilization } mill_outlet_temp_low : REAL := 60.0; { Risk of moisture condensation } mill_vibration_alarm : REAL := 6.0; { mm/s, ring flash or rough grinding } -- CONTROL LOOPS -- Loop 1: PA Flow (Primary) pa_flow_error : REAL; pa_flow_integral : REAL := 0.0; kp_pa_flow : REAL := 0.08; ki_pa_flow : REAL := 0.005; -- Loop 2: Temperature (Secondary) temp_error : REAL; temp_integral : REAL := 0.0; kp_temp : REAL := 0.20; ki_temp : REAL := 0.008; -- LOAD SCHEDULING boiler_load_mw : REAL; coal_demand_table : ARRAY[0..100] OF REAL; { Preloaded: load% → coal kg/s } pa_flow_from_load : REAL; -- OUTPUT COMMANDS mill_fan_vfd_command : REAL; { 0-60 Hz to mill fan drive } duct_heater_command : REAL; { 0-100 % electric or steam valve } -- DIAGNOSTICS coal_fineness_blaine : REAL; { cm²/g (from mill analyzer, slow) } fineness_trend : REAL; { Rising = fining; falling = coarsening } mill_health_index : INT; { 0-100; 100 = optimal } BEGIN { ========== LOAD-BASED PA FLOW SCHEDULING ========== } -- Furnace load determines coal feed demand -- Table: 0% load → 0 kg/s coal; 100% load → 40 kg/s coal -- Reverse lookup: coal demand → PA flow requirement -- Example coal_demand_table: -- [0] = 0 kg/s @ 0% load -- [25] = 10 kg/s @ 25% load -- [50] = 20 kg/s @ 50% load -- [75] = 30 kg/s @ 75% load -- [100] = 40 kg/s @ 100% load coal_demand_kg_s := coal_demand_table[ROUND(boiler_load_mw / 3)]; { Scale load to table index } { Assuming coal concentration 25% in PA stream: PA Flow = Coal Flow / 0.25 = Coal Flow × 4 } pa_flow_sp := coal_demand_kg_s × 4.0; { ========== LOOP 1: PA FLOW CONTROL (Primary) ========== } pa_flow_error := pa_flow_sp − pa_flow_actual; -- Proportional term p_term_flow := kp_pa_flow * pa_flow_error; -- Integral (slow correction) pa_flow_integral := pa_flow_integral + (ki_pa_flow * pa_flow_error * scan_time); IF pa_flow_integral > 0.20 THEN pa_flow_integral := 0.20; END_IF; IF pa_flow_integral < -0.15 THEN pa_flow_integral := -0.15; END_IF; -- VFD command (mill fan speed) mill_fan_vfd_command := 25.0 + (p_term_flow + pa_flow_integral) × 50.0; IF mill_fan_vfd_command < 10.0 THEN mill_fan_vfd_command := 10.0; END_IF; IF mill_fan_vfd_command > 60.0 THEN mill_fan_vfd_command := 60.0; END_IF; { ========== LOOP 2: MILL OUTLET TEMPERATURE CONTROL (Secondary) ========== } temp_error := mill_outlet_temp_sp − mill_outlet_temp; -- Proportional term (duct heater is fast, ~5 sec response) p_term_temp := kp_temp * temp_error; -- Integral temp_integral := temp_integral + (ki_temp * temp_error * scan_time); IF temp_integral > 0.30 THEN temp_integral := 0.30; END_IF; IF temp_integral < -0.20 THEN temp_integral := -0.20; END_IF; -- Duct heater command duct_heater_command := 40.0 + (p_term_temp + temp_integral) × 60.0; IF duct_heater_command < 0.0 THEN duct_heater_command := 0.0; END_IF; IF duct_heater_command > 100.0 THEN duct_heater_command := 100.0; END_IF; { ========== MILL HEALTH MONITORING ========== } -- Check 1: Vibration (fineness risk) IF mill_vibration > mill_vibration_alarm THEN { WARN: "Mill vibration high — possible ring flash or coarse coal" } -- If vibration persists: reduce mill output flow OR reduce bowl speed END_IF; -- Check 2: Motor current trend (grinding effort) IF coal_mill_load_amps > 400.0 THEN { WARN: "Mill motor current high — coal too wet OR bowl wear" } END_IF; -- Check 3: Temperature excursion (devolatilization) IF mill_outlet_temp > mill_outlet_temp_high THEN { ALARM: "Mill outlet temp HIGH — coal devolatilizing prematurely" } { ACTION: Reduce duct heater; increase PA damper opening } END_IF; -- Check 4: Temperature too low (condensation) IF mill_outlet_temp < mill_outlet_temp_low THEN { WARN: "Mill outlet temp low — moisture condensation risk; increase heater" } END_IF; -- Check 5: PA flow mismatch (flow meter fault or mill blockage) IF ABS(pa_flow_actual − pa_flow_sp) > 15.0 THEN { WARN: "PA flow mismatch by {value} kg/s — check for mill blockage or meter error" } END_IF; { ========== FINENESS MONITORING (Slow Feedback) ========== } -- Blaine value from mill analyzer (5–10 min lag) -- Track trend: increasing = coal getting finer (OK); decreasing = coarser (wear) IF coal_fineness_blaine < 1500.0 THEN { WARN: "Coal fineness LOW (coarse) — burner prep poor; CO may spike" } mill_health_index := 60; ELSIF coal_fineness_blaine > 3000.0 THEN { WARN: "Coal fineness HIGH (too fine) — ring flash possible; reduce mill" } mill_health_index := 65; ELSE mill_health_index := 95; { Optimal } END_IF; { ========== UPDATE STATE FOR NEXT CYCLE ========== } pa_flow_prev := pa_flow_actual; temp_prev := mill_outlet_temp; { ========== SEND COMMANDS ========== } -- Output 1: mill_fan_vfd_command (0-60 Hz to mill fan drive) -- Output 2: duct_heater_command (0-100 % to electric heater or steam valve) -- Output 3: mill_health_index (for HMI display) END_PROGRAM; ``` --- ## 🏷️ Tag List | Tag Name | Type | Range | Units | Description | |----------|------|-------|-------|-------------| | `PA_FLOW_ACTUAL` | AI | 0–150 | kg/s | Differential pressure flow meter (Annubar) | | `MILL_OUTLET_TEMP` | AI | 0–100 | °C | Coal-air mixture temperature (RTD) | | `PA_INLET_TEMP` | AI | 0–200 | °C | Duct heater outlet temperature | | `MILL_VIBRATION` | AI | 0–10 | mm/s | Accelerometer (fineness/ring flash indicator) | | `COAL_MILL_LOAD_AMPS` | AI | 0–500 | A | Motor current (grinding effort) | | `COAL_FINENESS_BLAINE` | AI | 1000–4000 | cm²/g | Blaine value (from mill analyzer, slow) | | `MILL_OUTLET_TEMP_SP` | REAL | 60–85 | °C | Setpoint | | `PA_FLOW_SP` | REAL | 0–150 | kg/s | Load-scheduled setpoint | | `MILL_FAN_VFD_CMD` | AO | 0–60 | Hz | 0-10 VDC to mill fan drive | | `DUCT_HEATER_CMD` | AO | 0–100 | % | Electric heater or steam valve command | --- ## 🚨 Alarm & Trip Matrix | Condition | Threshold | Severity | Action | Recovery | |-----------|-----------|----------|--------|----------| | **Temp High** | > 85°C | 🔴 CRIT | Reduce heater; coal may devolatilize | < 75°C | | **Temp Low** | < 60°C | ⚠️ WARN | Moisture condensation risk; increase heater | > 70°C | | **PA Flow Low** | <SP−15 kg/s | ⚠️ WARN | Mill blockage or meter fault; boost fan | >SP−5 kg/s | | **Vibration High** | > 6 mm/s | ⚠️ WARN | Ring flash or coarse product; reduce mill | < 4 mm/s | | **Motor Amp High** | > 450 A | ⚠️ WARN | Wet coal or bowl wear; reduce load | < 400 A | | **Fineness Coarse** | < 1500 Blaine | ⚠️ WARN | Poor coal grind; burner prep degraded | > 2000 | | **Fineness Fine** | > 3000 Blaine | 🔴 CRIT | Ring flash imminent; stop mill | < 2800 | --- ## 📺 HMI Layout ### Coal Mill Outlet Control Panel ``` ┌───────────────────────────────────────────────┐ │ COAL MILL OUTLET PA FLOW & TEMP CONTROL │ ├───────────────────────────────────────────────┤ │ │ │ ╔═════════════ PA FLOW STATUS ═════════╗ │ │ ║ Actual: 61.2 kg/s ║ │ │ ║ Setpoint: 60.0 kg/s (Load 50%)║ │ │ ║ Error: +1.2 kg/s (good) ║ │ │ ║ Mill Fan: ████████░░ 32 Hz ║ │ │ ╚═════════════════════════════════════════╝ │ │ │ │ ╔═════ TEMPERATURE & MOISTURE ═════╗ │ │ ║ Outlet: 74.5°C ✓ (SP: 75°C) ║ │ │ ║ Inlet: 125°C (Duct heater) ║ │ │ ║ ΔT: 50.5°C ║ │ │ ║ Heater: ███████░░░ 70% ║ │ │ ║ Moisture Risk: LOW ✓ ║ │ │ ╚═════════════════════════════════╝ │ │ │ │ ╔═════════ MILL HEALTH METRICS ════════╗ │ │ ║ Vibration: 2.3 mm/s (Normal) ║ │ │ ║ Motor Amps: 385 A (79% rated) ║ │ │ ║ Fineness: 2350 Blaine (Opt) ║ │ │ ║ Health Index: 95/100 Excellent ║ │ │ ╚═════════════════════════════════════╝ │ │ │ │ ⚠️ [NONE] 🔴 [NONE] │ │ │ │ Load: 50% | Coal: 20 kg/s | Status: Running │ │ │ └───────────────────────────────────────────────┘ ``` --- ## 🔧 Configuration Parameters ```json { "coal_mill_outlet": { "description": "PA flow + temperature control for coal mill outlet", "mill_outlet_temp_setpoint_celsius": 75.0, "scan_time_sec": 2.0, "pa_flow_control": { "proportional_gain_kp": 0.08, "integral_gain_ki": 0.005, "integral_limit_hi": 0.20, "integral_limit_lo": -0.15, "fan_vfd_range_hz": [10.0, 60.0] }, "temperature_control": { "proportional_gain_kp": 0.20, "integral_gain_ki": 0.008, "integral_limit_hi": 0.30, "integral_limit_lo": -0.20, "heater_range_percent": [0, 100] }, "alarms": { "temp_high_celsius": 85.0, "temp_low_celsius": 60.0, "vibration_alarm_mm_per_sec": 6.0, "motor_amp_alarm": 450.0, "fineness_min_blaine": 1500.0, "fineness_max_blaine": 3000.0 }, "load_scheduling": { "coal_demand_at_0_percent_load_kg_s": 0.0, "coal_demand_at_50_percent_load_kg_s": 20.0, "coal_demand_at_100_percent_load_kg_s": 40.0, "coal_concentration_percent": 25.0 } } } ``` --- ## 📝 Implementation Checklist ### Commissioning (3 days) **Day 1: Hardware Verification** - [ ] PA flow meter calibrated: 0–150 kg/s ±5% accuracy - [ ] RTD temps verified: outlet ±2°C, inlet ±2°C - [ ] Mill fan VFD tested: 10–60 Hz ramp smooth ✓ - [ ] Duct heater response: 0% → 100% → temp rises ~40°C ✓ - [ ] Vibration sensor baseline: normal operation <2 mm/s **Day 2: Control Loop Commissioning (10% load, low coal flow)** - [ ] PA flow setpoint engaged: VFD adjusts to hold ~7 kg/s ✓ - [ ] Temperature setpoint 75°C: heater modulates smoothly ✓ - [ ] No oscillation in either loop ✓ - [ ] Load table verified: 50% furnace load → 20 kg/s coal demand **Day 3: Full-Load Validation** - [ ] 100% load: PA flow = 60 kg/s held ±3% ✓ - [ ] Outlet temperature 75°C ±2°C stable ✓ - [ ] Fineness from mill analyzer: 2000–2500 Blaine (good grind) ✓ - [ ] 4-hour stability run: zero coal blockage events ✓ --- ## 📊 Expected Performance (50% Load, Optimal) | Parameter | Target | Range | Typical | |-----------|--------|-------|---------| | **PA Flow** | 60 kg/s | 58–62 kg/s | **60.2 kg/s** | | **Outlet Temp** | 75°C | 73–77°C | **74.5°C** | | **Mill Vibration** | <3 mm/s | <5 mm/s | **2.3 mm/s** | | **Motor Current** | 350 A | <450 A | **385 A** | | **Coal Fineness** | 2300 Blaine | 2000–2600 | **2350** | | **Mill Health** | 95/100 | >80/100 | **95** | --- ## 📄 Document Version History | Version | Date | Author | Change | |---------|------|--------|--------| | 1.0 | 2026-04-13 | Claude | Initial template: Load-scheduled PA flow + duct heater temperature control | --- *This template is part of the TSIMEREZIVO Industrial Process Control Library. Now complete: 10/10 Power Plant Templates ✅*

More like this

Rate, comment, and get full access

Members can download files, rate contributions, and discuss fixes with the engineers who posted them — free.

Join the library