Field fix / guideCommissioning ProcedureVendor-agnosticCommissioningindustrial-automation

SAT & Commissioning Checklist

Shared by TSIMEREZIVO Team · 4 Oct 2026 · 58 views

# SAT & Commissioning Checklist Template Project: ______________ Site: ______________ SAT No: SAT-____ Date: ______________ System: ______________ Rev: __ ## 1. Purpose Demonstrate the installed system works in the real plant environment — the FAT proved the panel; the SAT proves the process. ## 2. Prerequisites - [ ] All FAT punch items (Cat A/B) closed - [ ] Loop checks 100% complete and signed - [ ] Instruments calibrated and certificated - [ ] Cable megger/continuity records filed - [ ] Software version = FAT-approved version (record hash/build) - [ ] As-built drawings issued for construction - [ ] Permit to work / LOTO procedures agreed - [ ] Operations team briefed on test scope ## 3. Installation verification - [ ] Panel earthing: <1 Ω instrument earth, separate from power earth - [ ] Cable glands, segregated trays, screen termination per spec - [ ] Instrument impulse lines leak-tested - [ ] Environmental: temperature/dust/humidity within panel rating ## 4. Loop checks (per instrument index) For each loop record: injected/measured value → SCADA value → PASS/FAIL. - [ ] Analog loops end-to-end (field → marshalling → I/O → HMI) - [ ] Digital: field contact → correct tag + correct state on HMI - [ ] Control valves: stroke test 0–25–50–75–100%, verify positioner - [ ] HART/smart variables reading correctly ## 5. Process functional tests - [ ] Interlocks on live signals (bypass register controlled + logged) - [ ] Trip setpoints proven at the process value, not just simulated - [ ] PID loops: step response, tune, record final P/I/D per loop - [ ] Sequences run against real equipment with ops witnessing - [ ] Alarms: generate one real alarm per area, verify annunciation ## 6. Integrated tests - [ ] Utility failure recovery (power dip, air loss, network break) - [ ] Emergency shutdown activation path — full chain, real output - [ ] Operator handover: shifts can run the system unassisted ## 7. Documentation handover - [ ] As-built markups returned to drafting - [ ] Software backup taken post-SAT and stored in vault - [ ] Loop folders complete: certs, loop checks, datasheets - [ ] Training records signed ## 8. Punch list & sign-off | # | Item | Category | Owner | Closed | |---|---|---|---|---| | 1 | | | | | SAT PASSED / CONDITIONAL / FAILED — circle one. Conditional pass requires a dated action plan signed by client + vendor.

More like this

Rate, comment, and get full access

Members can download files, rate contributions, and discuss fixes with the engineers who posted them — free.

Join the library